The list below summarizes changes to the original construction documents.
- Walls
- Walls for several offices (P114, M101, and M110) have been adjusted slightly to avoid conflicts with existing floor outlets.
- The small wall and door separating rooms P107 and P118 have been eliminated due to conflicts (also 2A).
- Doors
- The small wall and door separating rooms P107 and P118 have been eliminated due to conflicts (also 1B).
- The door to the north (downtown side) corridor from P115 has been eliminated (drafting error).
- Flooring
The building standard carpet has been substituted for much of the luxury vinyl plank (LVP) in the lobby areas to resolve a conflict between the LVP and the building's electrical floor chases.